Stratford Site


Hideaway III
(INSU-LOG)






INTERIOR PICTURES CLICK HERE   WALKOUT BASEMENT PICTURES

Matching Single Garage







Forced Air Energy Efficient Heating, Airconditioning & HRV Installed  


Power Mast Installed/ Log Siding being Completed 

 

New Concrete Porch/Cold Cellar Poured /Log Siding being Installed 


Shingles Completed


Windows being installed

Installation of Roof Truss System

Roof Trusses Boomed Onto Upper Deck

1st & 2nd Floor & Wall Systems Completed


Backfill & Graded Walkout Complete/Main Floor Wall Sections secured to Engineered sub floor

Damp proofing Completed, Water Line Installed, ready for backfill
 Engineered sub floor system completed


Basement Wall Forms Removed

Basement Wall Pour Completed 

Pumping Concrete - Basement Wall Forms  

Foundation Footings Poured 

Site Prep for Full Basement with Walk Out 

Site Excavation